  May, 2014, Impressions Team

Impressions Team Accomplishments
May, 2014
Florida, North Carolina, Kansas


This special construction team accomplished the following tasks:

1) Drop ceilings and 14 new lights (total) were installed in five rooms.
2) Wooden floors were laid and baseboards in four rooms.
3) The entry way was re-leveled (with 2 bags of self-leveling cement) and tiled, the entry door was furred out, drywalled, cornerbead set, and all three door entries were resized with cornerbead and first coat of plaster applied.
4) Six window gaps were resized in the conference room and the marketing office.
5) Eight doors were installed after resizing the openings, drywalled and cornerbeaded.
6) Six of the doors were stained with a rich oak varnish.
7) All the window and door trim was primed.
8) Half the studs were installed from the top of the office deck to the shop ceiling which will support the drywall so they won't have to heat that upper area.

We are grateful that Rudy Nussbaumer (the father of BLF Europe’s Director of Operations) came from Alsace and finished the electrical hookups. He was a tremendous help.

Each team member worked in his/her specialty area, knew just what to do, and worked efficiently. Now all four offices are useable as well as the reception room and the conference room (in fact they were using it before we had quite finished).

In addition to all of this, the team still had time to visit the Bruges, Chateau de Bouillon, the boat lift at Strepy-Thieu, Arras tower and underground caves.

  May, 2014, Impressions Team Photo Gallery

Team in front of city hall in Brugges 1. Team in front of city hall in Brugges

Church of Our Lady in Bruges, Belgium 2. Church of Our Lady in Bruges, Belgium

Team by Lake of Love in Brugges 3. Team by Lake of Love in Brugges

Keith preparing ceiling grid 4. Keith preparing ceiling grid

Keith and Nathan removing BLF display 5. Keith and Nathan removing BLF display

Tammy puts down foam underlayment for hardwood floor 6. Tammy puts down foam underlayment for hardwood floor

Diane prepares to prime door trim 7. Diane prepares to prime door trim

Larry installs ceiling lights 8. Larry installs ceiling lights

Rob levels door 9. Rob levels door

Team at BLF 10. Team at BLF

Ruben prepares for software training in conference room 11. Ruben prepares for software training in conference room

Diane varnishes doors 12. Diane varnishes doors

Rob levels door, Nathan looks on 13. Rob levels door, Nathan looks on

Russ and Tammy level entrance floor 14. Russ and Tammy level entrance floor

Raclette dinner menu at Kapitaniuks' home 15. Raclette dinner menu at Kapitaniuks' home

Last hardwood board to be installed 16. Last hardwood board to be installed

Assembling studs for drywall above offices 17. Assembling studs for drywall above offices

Nathan installing studs 18. Nathan installing studs

Tammy at the chop saw 19. Tammy at the chop saw

Keith lays tile in entrance 20. Keith lays tile in entrance

Team at Chateau de Bouillon 21. Team at Chateau de Bouillon

Mary Ann, Marie-Pierre, Willy at Feignies church 22. Mary Ann, Marie-Pierre, Willy at Feignies church

Team at City Hall in Arras 23. Team at City Hall in Arras

Millers in tunnels under City Hall, Arras 24. Millers in tunnels under City Hall, Arras

Grouting entrance floor tile before leaving the job 25. Grouting entrance floor tile before leaving the job

Russ prepares drywall mud 26. Russ prepares drywall mud

Corner bead installed 27. Corner bead installed

Corner mudding at office entrance 28. Corner mudding at office entrance

Applying first coat of plaster on front door trim 29. Applying first coat of plaster on front door trim

Connect with BLF-USA through any or all of the following ways!
Email LogoContact BLF-USA through email
Prayer and Praise LogoSubscribe to the BLF-USA Prayer and Praise!
Facebook LogoBecome a fan of BLF-USA on Facebook!
Twitter LogoFollow BLF-USA on Twitter!
Copyright 2015 - BLF USA - Wheaton, IL - USA
Design BLF Europe and eComChoice and Integrated Resources Corporation